Organize a Project, continued | |
| page 4 |
Part 4: Complete the Details and Move InAfter demolition, construction, and finishing the shell, move on to the details of your project. INSTALL THE DETAILS
Install the finish light fixtures, sconces, ceiling fans, chandeliers, etc. This is best done when wall and ceiling finishes have dried completely to avoid damaging these surfaces.
Install blinds or shades nearest the glass first, then work outward to the draperies, valances, and cornices.
Install cabinet handles, door knobs, window hardware, etc. after the paint has dried thoroughly. MOVE IN and ACCESSORIZE
Bring in and place area rugs.
Set largest furniture pieces in the room. Next move in the TV, computer equipment, or sound system. Finally, bring in and place smaller tables, lamps, and accent furniture around the room.
Bring in very large accessories, plants, and sculptures. Place these before moving in smaller accessory pieces.
Hang artwork and mirrors in relation to the wall spaces as well as nearby furniture. Fill bookshelves with books and accessories, place urns on the mantle, wood in the fireplace, magazines on the table.
Flooring installation and other work has likely left a few scratches and dings on the walls. Repair any dents and touch up the paint.
Make fine tuning adjustments to furniture placement, accessories, and artwork after living in the space for a while. But most of all, enjoy the completion of your project! Go to: Back to Page 1 Plan and Prepare Remove and Build Walls and Floors |
| ~ Glenna Morton |
| previous |1 |2 |3 |4 |
